Precision Military Tracking Complex
Industrial-scale production employing robotic lattice-mounting systems, automated optical calibration, and quantum processor synchronization to achieve perfect weapon alignment under extreme operational conditions.
productionTier 3 of 4precision_military_tracking_complex
Stats
CategoryProduction
Level3
Build Cost5,740,000 cr
Build Time330 ticks
Labor Cost140
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Military Tracking Assembly Line | 666,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Advanced Military Tracking Plant | 2,046,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Precision Military Tracking Complexthis tier | 5,740,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Combat-Grade Tracking Fabrication System | 17,931,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.