Precision Tow Fabrication Bay
An expanded facility with precision sensor calibration stations and structural frame integration, tripling production speed while optimizing the efficiency characteristics of each rig.
productionTier 2 of 4precision_tow_fabrication_bay
Stats
CategoryProduction
Level2
Build Cost401,000 cr
Build Time280 ticks
Labor Cost28
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Advanced Tow Workshop | 177,000 | 180 | 14 | 1 | 1 | 5 |
| L2 | Precision Tow Fabrication Baythis tier | 401,000 | 280 | 28 | 2 | 1 | 6 |
| L3 | Tow Systems Production Plant | 1,284,000 | 380 | 48 | 4 | 1 | 7 |
| L4 | Apex Tow Engineering Nexus | 3,920,000 | 480 | 70 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.