Precision Wire Complex
Industrial-scale operation with reinforced infrastructure, multiple plasma injection stages, and advanced coolant circulation. Processes ore at near-instantaneous rates through optimized thermal cycling.
productionTier 3 of 4precision_wire_complex
Stats
CategoryProduction
Level3
Build Cost926,000 cr
Build Time180 ticks
Labor Cost21
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Wire Spinner | 106,000 | 90 | 6 | 1 | 1 | 3 |
| L2 | Automated Draw Mill | 315,000 | 130 | 12 | 2 | 1 | 6 |
| L3 | Precision Wire Complexthis tier | 926,000 | 180 | 21 | 4 | 1 | 7 |
| L4 | Zero-Defect Drawing Plant | 2,713,000 | 220 | 30 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.