Quantum Hydrogen Nexus
State-of-the-art cryogenic plant with adaptive pressure management and regenerative cooling cycles. Achieves near-instantaneous hydrogen liquefaction with full process automation and zero boil-off containment.
productionTier 4 of 4quantum_hydrogen_nexus
Stats
CategoryProduction
Level4
Build Cost2,624,000 cr
Build Time220 ticks
Labor Cost25
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Hydrogen Compression Cylinder | 94,000 | 90 | 5 | 1 | 1 | 3 |
| L2 | Hydrogen Liquefaction Plant | 296,000 | 130 | 10 | 2 | 1 | 6 |
| L3 | Cryogenic Liquefaction Complex | 871,000 | 170 | 18 | 4 | 1 | 7 |
| L4 | Quantum Hydrogen Nexusthis tier | 2,624,000 | 220 | 25 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.