Quantum Substrate Fabrication Complex
State-of-the-art center where quantum control cores and precision optics work in concert to produce refined quantum matrices at maximum fidelity. Redundant processing systems ensure continuous high-throughput output.
productionTier 4 of 4quantum_substrate_fabrication_complex
Stats
CategoryProduction
Level4
Build Cost15,774,000 cr
Build Time560 ticks
Labor Cost80
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Assemble Quantum MatrixComponents
67.5 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Quantum Assembly Jig | 548,000 | 220 | 16 | 1 | 1 | 5 |
| L2 | Precision Quantum Workstation | 1,710,000 | 340 | 32 | 2 | 1 | 6 |
| L3 | Quantum Matrix Production Line | 4,998,000 | 450 | 56 | 4 | 1 | 7 |
| L4 | Quantum Substrate Fabrication Complexthis tier | 15,774,000 | 560 | 80 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.