Reinforced Hull Works
An integrated facility combining plating shears, bonding presses, and shield-emitter calibration stations to produce reinforced bracing at higher throughput. Copper piping runs coolant through the bonding zones.
productionTier 2 of 4reinforced_hull_works
Stats
CategoryProduction
Level2
Build Cost433,000 cr
Build Time250 ticks
Labor Cost22
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Hull Plating Bonding Line | 135,000 | 170 | 11 | 1 | 1 | 3 |
| L2 | Reinforced Hull Worksthis tier | 433,000 | 250 | 22 | 2 | 1 | 6 |
| L3 | Automated Hull Reinforcement Plant | 1,211,000 | 330 | 38 | 4 | 1 | 7 |
| L4 | Advanced Hull Reinforcement Factory | 3,615,000 | 420 | 55 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.