Separator Module Plant
Batch benches frame each ejector around its magnetic throat, processing cores calibrated to catch paramagnetic vanadium without snagging the ore beside it.
productionTier 2 of 4separator_module_plant
Stats
CategoryProduction
Level2
Build Cost606,400 cr
Build Time150 ticks
Labor Cost15
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Build Vanadium EjectorModules
25.5 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Eddy-Coil Bench | 216,067 | 100 | 8 | 1 | 1 | 5 |
| L2 | Separator Module Plantthis tier | 606,400 | 150 | 15 | 2 | 1 | 6 |
| L3 | Eddy-Current Fabrication Complex | 2,017,067 | 220 | 28 | 4 | 1 | 7 |
| L4 | Automated Ejector Works | 5,513,667 | 300 | 40 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.