Shield Booster II Assembly Plant
Industrial-scale production center with quantum control systems and coolant loop infrastructure for thermal management during superconductor integration. Reinforced frames support sustained high-volume assembly.
productionTier 3 of 4shield_booster_ii_assembly_plant
Stats
CategoryProduction
Level3
Build Cost6,366,000 cr
Build Time220 ticks
Labor Cost25
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Shield Booster II Workshop | 721,000 | 110 | 7 | 1 | 1 | 5 |
| L2 | Shield Booster II Production Lab | 2,138,000 | 170 | 14 | 2 | 1 | 6 |
| L3 | Shield Booster II Assembly Plantthis tier | 6,366,000 | 220 | 25 | 4 | 1 | 7 |
| L4 | Shield Booster II Fabrication Nexus | 19,065,000 | 280 | 35 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.