Shield Hardening Production Line
An expanded facility with dedicated calibration stations and resonance-tuning chambers. Multiple assembly tracks operate in parallel, each equipped with null-matter processors that verify circuit coherence before final matrix encapsulation.
productionTier 2 of 4shield_hardening_production_line
Stats
CategoryProduction
Level2
Build Cost2,407,000 cr
Build Time250 ticks
Labor Cost20
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Shield Resonance Assembly | 839,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Shield Hardening Production Linethis tier | 2,407,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Automated Shield Works | 7,660,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Shield Hardener Fabrication Plant | 23,021,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.