State-of-the-Art Beam Fabrication
Fully automated production facility with cryogenic coolant loops maintaining precision tolerances throughout assembly. Delivers combat-ready Judgment Beams at maximum throughput with integrated targeting and power validation.
productionTier 4 of 4state_of_the_art_beam_fabrication
Stats
CategoryProduction
Level4
Build Cost48,044,000 cr
Build Time420 ticks
Labor Cost50
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Judgment Beam Assembly Line | 1,770,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Automated Beam Works | 5,189,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Judgment Beam Production Plant | 14,981,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | State-of-the-Art Beam Fabricationthis tier | 48,044,000 | 420 | 50 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.