State-of-the-Art Power Cell Fabrication
Cutting-edge facility leveraging quantum control systems and extensive sensor arrays for real-time quality assurance and near-instantaneous assembly of premium power cells.
productionTier 4 of 4state_of_the_art_power_cell_fabrication
Stats
CategoryProduction
Level4
Build Cost3,737,000 cr
Build Time420 ticks
Labor Cost40
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Power Cell Assembler | 139,000 | 150 | 10 | 1 | 1 | 3 |
| L2 | Automated Power Cell Plant | 434,000 | 250 | 16 | 2 | 1 | 6 |
| L3 | High-Capacity Power Cell Works | 1,199,000 | 330 | 28 | 4 | 1 | 7 |
| L4 | State-of-the-Art Power Cell Fabricationthis tier | 3,737,000 | 420 | 40 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.