Steel Frame Assembly Line
A dedicated production line that cuts, bends, and welds steel plates into girder skeletons, then integrates copper piping runs for internal systems. Output is steady and reliable for basic facility construction.
productionTier 1 of 4steel_frame_assembly_line
Stats
CategoryProduction
Level1
Build Cost128,000 cr
Build Time170 ticks
Labor Cost5
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Assemble Structural FrameFacility Construction
7.8 ticks
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Steel Frame Assembly Linethis tier | 128,000 | 170 | 5 | 1 | 1 | 3 |
| L2 | Automated Frame Plant | 324,000 | 250 | 10 | 2 | 1 | 5 |
| L3 | High-Speed Frame Factory | 912,000 | 330 | 18 | 4 | 1 | 5 |
| L4 | State-of-the-Art Frame Facility | 3,159,000 | 420 | 25 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.