Stellar Plating Works
State-of-the-art facility with modular bonding arrays, automated material flow via docking rings, and reinforced structural framing throughout. Advanced control systems optimize adhesion parameters in real time, achieving peak throughput with zero defect rates.
productionTier 4 of 4stellar_plating_works
Stats
CategoryProduction
Level4
Build Cost2,408,000 cr
Build Time250 ticks
Labor Cost35
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Plate Press | 115,000 | 100 | 7 | 1 | 1 | 3 |
| L2 | Armor Fabricator | 295,000 | 150 | 14 | 2 | 1 | 6 |
| L3 | Hull Assembly Line | 787,000 | 200 | 25 | 4 | 1 | 7 |
| L4 | Stellar Plating Worksthis tier | 2,408,000 | 250 | 35 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.