Storage Optimization Plant
Expanded facility with increased hull plating capacity and structural framing to support faster matrix assembly. Control nodes coordinate the precise lens and polymer integration required for efficient packing.
productionTier 2 of 4storage_optimization_plant
Stats
CategoryProduction
Level2
Build Cost1,391,000 cr
Build Time250 ticks
Labor Cost80
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Cargo Matrix Assembly Line | 551,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Storage Optimization Plantthis tier | 1,391,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Prismatic Cargo Fabrication Works | 4,608,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Advanced Cargo Matrix Production Factory | 13,197,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.