Strip Miner Production Complex
Fully automated state-of-the-art facility with precision-optic laser-focusing systems and quantum-controlled power distribution. Every mining module undergoes real-time extraction-efficiency validation before deployment.
productionTier 4 of 4strip_miner_production_complex
Stats
CategoryProduction
Level4
Build Cost27,294,000 cr
Build Time420 ticks
Labor Cost50
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Mining Module Assembly Line | 1,001,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Strip Miner Manufacturing Plant | 2,944,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Mining Equipment Factory | 8,494,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Strip Miner Production Complexthis tier | 27,294,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.