Thermal Ice Extraction Line
Purpose-built facility for assembling ice-harvester modules with ceramite thermal plating and liquid-nitrogen cooling systems to enable enhanced ice extraction.
productionTier 1 of 4thermal_ice_extraction_line
Stats
CategoryProduction
Level1
Build Cost141,000 cr
Build Time130 ticks
Labor Cost9
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Thermal Ice Extraction Linethis tier | 141,000 | 130 | 9 | 1 | 1 | 5 |
| L2 | Cryogenic Upgrade Forge | 412,000 | 200 | 18 | 2 | 1 | 6 |
| L3 | Thermal Extraction Complex | 1,273,000 | 260 | 32 | 4 | 1 | 7 |
| L4 | Cryogenic Synthesis Array | 3,589,000 | 330 | 45 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.