Thorium Fuel Rod Containment Vat
Containerization system designed for thorium fuel rods with integrated lead-shielding application and hazmat casing. Handles batch processing of fuel rod pairs into transport-ready containers.
productionTier 1thorium_fuel_rod_containment_vat
Stats
CategoryProduction
Level1
Build Cost362,000 cr
Build Time110 ticks
Labor Cost8
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Wrap Thorium Fuel RodRefining
52.5 ticks · Facility only
Upgrade Chain
Thorium Fuel Rod Containment Vat has no upgrade path — it is built once, at this level.