Tracking Computer I Production Lab
Multi-stage facility with dedicated stations for processing-core insertion, sensor array calibration, and circuit-board integration, featuring in-process quality gates that verify tracking accuracy before final packaging.
productionTier 2 of 4tracking_computer_i_production_lab
Stats
CategoryProduction
Level2
Build Cost1,630,000 cr
Build Time140 ticks
Labor Cost12
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Tracking Computer I Workshop | 523,000 | 100 | 6 | 1 | 1 | 5 |
| L2 | Tracking Computer I Production Labthis tier | 1,630,000 | 140 | 12 | 2 | 1 | 6 |
| L3 | Tracking Computer I Assembly Facility | 4,955,000 | 190 | 21 | 4 | 1 | 7 |
| L4 | Tracking Computer I Technology Nexus | 14,398,000 | 240 | 30 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.