Tracking Computer II Production Lab
Larger manufacturing facility with separate workflow streams for tracking-system pairing, optical fiber fusion, and circuit-board population, then merged for final processing-core integration and functional testing.
productionTier 2 of 4tracking_computer_ii_production_lab
Stats
CategoryProduction
Level2
Build Cost3,022,000 cr
Build Time140 ticks
Labor Cost12
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Tracking Computer II Workshop | 1,001,000 | 100 | 6 | 1 | 1 | 5 |
| L2 | Tracking Computer II Production Labthis tier | 3,022,000 | 140 | 12 | 2 | 1 | 6 |
| L3 | Tracking Computer II Assembly Facility | 8,982,000 | 190 | 21 | 4 | 1 | 7 |
| L4 | Tracking Computer II Technology Nexus | 28,065,000 | 240 | 30 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.