Tungsten Sintering Furnace
Powder-metallurgy furnace that sinters tungsten into the iron melt for a denser, harder plate while stretching each batch of iron further.
productionTier 1 of 2tungsten_sintering_furnace
Stats
CategoryProduction
Level1
Build Cost23,000 cr
Build Time150 ticks
Labor Cost10
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (2 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Tungsten Sintering Furnacethis tier | 23,000 | 150 | 10 | 1 | 1 | 2 |
| L2 | Tungsten Steel Mill | 90,000 | 250 | 20 | 2 | 1 | 3 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.