Uranium Ore Processor
Heavy-duty refinery with cascading leach stages, solvent recovery, and integrated hazmat systems operating under full radiation protection. Produces yellowcake concentrate at industrial scale with consistent high purity.
productionTier 3 of 4uranium_ore_processor
Stats
CategoryProduction
Level3
Build Cost1,013,000 cr
Build Time310 ticks
Labor Cost38
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Uranium Leach Pad | 132,000 | 160 | 11 | 1 | 1 | 3 |
| L2 | Yellowcake Plant | 316,000 | 230 | 22 | 2 | 1 | 6 |
| L3 | Uranium Ore Processorthis tier | 1,013,000 | 310 | 38 | 4 | 1 | 7 |
| L4 | Industrial Uranium Mill | 3,026,000 | 400 | 54 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.