Water Recycler Hub
Fully automated precision plant with distributed sensor arrays and extensive precision optics. Produces purification systems at maximum efficiency with continuous quality validation and real-time contamination monitoring.
productionTier 4 of 4water_recycler_hub
Stats
CategoryProduction
Level4
Build Cost2,742,000 cr
Build Time300 ticks
Labor Cost45
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Water Recycler Workshop | 105,000 | 120 | 9 | 1 | 1 | 3 |
| L2 | Water Recycler Plant | 268,000 | 180 | 18 | 2 | 1 | 6 |
| L3 | Water Recycler Facility | 859,000 | 240 | 32 | 4 | 1 | 7 |
| L4 | Water Recycler Hubthis tier | 2,742,000 | 300 | 45 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.