Acquisition Systems Plant
Efficient multi-stage facility with dedicated sensor-array preparation, crystal-alignment workstations, and circuit-board integration steps, followed by comprehensive targeting-accuracy validation and performance logging.
productionTier 2 of 4acquisition_systems_plant
Stats
CategoryProduction
Level2
Build Cost1,107,000 cr
Build Time210 ticks
Labor Cost20
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Tracking System Assembly Line | 378,000 | 140 | 10 | 1 | 1 | 5 |
| L2 | Acquisition Systems Plantthis tier | 1,107,000 | 210 | 20 | 2 | 1 | 6 |
| L3 | Fire Control Manufacturing Works | 3,278,000 | 280 | 35 | 4 | 1 | 7 |
| L4 | Precision Targeting Institute | 9,833,000 | 360 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.