Fire Control Manufacturing Works
Industrial-scale production featuring precision optical alignment rigs, quantum control core integration, and automated calibration systems that optimize sensor sensitivity and crystal-focusing for sub-millisecond target acquisition.
productionTier 3 of 4fire_control_manufacturing_works
Stats
CategoryProduction
Level3
Build Cost3,278,000 cr
Build Time280 ticks
Labor Cost35
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Tracking System Assembly Line | 378,000 | 140 | 10 | 1 | 1 | 5 |
| L2 | Acquisition Systems Plant | 1,107,000 | 210 | 20 | 2 | 1 | 6 |
| L3 | Fire Control Manufacturing Worksthis tier | 3,278,000 | 280 | 35 | 4 | 1 | 7 |
| L4 | Precision Targeting Institute | 9,833,000 | 360 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.