Advanced Cryogenic Works
Cutting-edge facility with extensive reinforced construction supporting maximum-pressure helium-3 and liquid nitrogen blending. Simultaneous multi-stream copper piping integration and thermal-seal verification at peak efficiency for mission-critical cooling systems.
productionTier 4 of 4advanced_cryogenic_works
Stats
CategoryProduction
Level4
Build Cost3,109,000 cr
Build Time420 ticks
Labor Cost35
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Assemble Coolant LoopFacility Construction
9.9 ticks
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Coolant Loop Assembly Line | 125,000 | 170 | 7 | 1 | 1 | 3 |
| L2 | Cryogenic Production Plant | 377,000 | 250 | 14 | 2 | 1 | 5 |
| L3 | Coolant Manufacturing Complex | 1,075,000 | 330 | 24 | 4 | 1 | 5 |
| L4 | Advanced Cryogenic Worksthis tier | 3,109,000 | 420 | 35 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.