Coolant Manufacturing Complex
Industrial-scale cryogenic production with reinforced framing managing extreme thermal differentials and pressurized gas flows. Multiple piping integration stations run in parallel, each sealed and pressure-tested for industrial duty.
productionTier 3 of 4coolant_manufacturing_complex
Stats
CategoryProduction
Level3
Build Cost1,075,000 cr
Build Time330 ticks
Labor Cost24
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Assemble Coolant LoopFacility Construction
9.9 ticks
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Coolant Loop Assembly Line | 125,000 | 170 | 7 | 1 | 1 | 3 |
| L2 | Cryogenic Production Plant | 377,000 | 250 | 14 | 2 | 1 | 5 |
| L3 | Coolant Manufacturing Complexthis tier | 1,075,000 | 330 | 24 | 4 | 1 | 5 |
| L4 | Advanced Cryogenic Works | 3,109,000 | 420 | 35 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.