Advanced Reactor Module Complex
State-of-the-art facility featuring extensive coolant loops for heat management during assembly, quantum-controlled fuel positioning, and comprehensive radiation-hardened circuit integration. Hazmat containers provide fail-safe containment while precision monitoring systems validate reactor performance before delivery.
productionTier 4 of 4advanced_reactor_module_complex
Stats
CategoryProduction
Level4
Build Cost36,335,000 cr
Build Time680 ticks
Labor Cost95
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Reactor Module Assembly Cell | 1,681,000 | 270 | 22 | 1 | 1 | 5 |
| L2 | Nuclear Module Fabrication Bay | 3,937,000 | 390 | 42 | 2 | 1 | 6 |
| L3 | Reactor Assembly Plant | 12,112,000 | 520 | 68 | 4 | 1 | 7 |
| L4 | Advanced Reactor Module Complexthis tier | 36,335,000 | 680 | 95 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.