Nuclear Module Fabrication Bay
Expanded facility with dedicated fuel-assembly staging, automated lead-shielding welding, and integrated radiation-hardened circuit insertion. Structural frames provide containment during assembly while control nodes coordinate multi-stage fuel and shielding integration.
productionTier 2 of 4nuclear_module_fabrication_bay
Stats
CategoryProduction
Level2
Build Cost3,937,000 cr
Build Time390 ticks
Labor Cost42
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Reactor Module Assembly Cell | 1,681,000 | 270 | 22 | 1 | 1 | 5 |
| L2 | Nuclear Module Fabrication Baythis tier | 3,937,000 | 390 | 42 | 2 | 1 | 6 |
| L3 | Reactor Assembly Plant | 12,112,000 | 520 | 68 | 4 | 1 | 7 |
| L4 | Advanced Reactor Module Complex | 36,335,000 | 680 | 95 | 6 | 1 | 8 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.