Automated Cabin Fabrication
Larger industrial plant with structural framing that accelerates cabin construction and life support integration. Multiple assembly stations work in parallel to frame, outfit, and test each cabin before completion.
productionTier 2 of 4automated_cabin_fabrication
Stats
CategoryProduction
Level2
Build Cost3,618,000 cr
Build Time250 ticks
Labor Cost80
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Passenger Cabin Assembly Plant | 1,223,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Automated Cabin Fabricationthis tier | 3,618,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Precision Cabin Manufacturing | 10,888,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Quantum Cabin Manufacturing | 31,863,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.