Passenger Cabin Assembly Plant
A specialized production facility that fabricates titanium-alloy frames, installs life support units, and integrates control systems into luxury cabin modules. Flex polymer linings and circuit boards are fitted for comfort and climate control.
productionTier 1 of 4passenger_cabin_assembly_plant
Stats
CategoryProduction
Level1
Build Cost1,223,000 cr
Build Time170 ticks
Labor Cost40
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Passenger Cabin Assembly Plantthis tier | 1,223,000 | 170 | 40 | 1 | 1 | 5 |
| L2 | Automated Cabin Fabrication | 3,618,000 | 250 | 80 | 2 | 1 | 6 |
| L3 | Precision Cabin Manufacturing | 10,888,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Quantum Cabin Manufacturing | 31,863,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.