Automated H2O2 Refinery Works
State-of-the-art manufacturing system where quantum control cores manage heat-sink integration, precision optics guide coolant-loop assembly, and reinforced frames carry the line throughout. Optimized material flow achieves 33-second production cycles.
productionTier 4 of 4automated_h2o2_refinery_works
Stats
CategoryProduction
Level4
Build Cost14,447,333 cr
Build Time420 ticks
Labor Cost50
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Electrolysis Unit Assembly Line | 567,600 | 170 | 10 | 1 | 1 | 5 |
| L2 | Water Reclamation Workshop | 1,611,933 | 250 | 20 | 2 | 1 | 6 |
| L3 | H2O2 Refinery Manufacturing Plant | 5,085,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Automated H2O2 Refinery Worksthis tier | 14,447,333 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.