Bespoke Observation Deck Production
State-of-the-art facility with quantum-controlled alignment, distributed processing cores, and precision optic inspection throughout. Reinforced infrastructure and advanced material handling achieve 33-second observation-deck cycles.
productionTier 4 of 4bespoke_observation_deck_production
Stats
CategoryProduction
Level4
Build Cost44,000,000 cr
Build Time420 ticks
Labor Cost200
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Observation Deck Fabrication Unit | 1,820,000 | 170 | 40 | 1 | 1 | 6 |
| L2 | Panoramic Deck Assembly Plant | 5,200,000 | 250 | 80 | 2 | 1 | 7 |
| L3 | Precision Viewport Manufacturing Complex | 15,200,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Bespoke Observation Deck Productionthis tier | 44,000,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.