Precision Viewport Manufacturing Complex
Heavy-duty plant with precision optics guiding dome and viewport assembly, quantum control cores managing structural sealing and lounge integration across multiple decks. Reinforced construction supports continuous five-minute output.
productionTier 3 of 4precision_viewport_manufacturing_complex
Stats
CategoryProduction
Level3
Build Cost15,200,000 cr
Build Time330 ticks
Labor Cost140
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Observation Deck Fabrication Unit | 1,820,000 | 170 | 40 | 1 | 1 | 6 |
| L2 | Panoramic Deck Assembly Plant | 5,200,000 | 250 | 80 | 2 | 1 | 7 |
| L3 | Precision Viewport Manufacturing Complexthis tier | 15,200,000 | 330 | 140 | 4 | 1 | 7 |
| L4 | Bespoke Observation Deck Production | 44,000,000 | 420 | 200 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.