Cargo Shielding Bay
Larger facility with coolant-loop circulation through the lead-lamination process, preventing thermal warping during assembly. Structural frames support heavier pressing machinery.
productionTier 2 of 4cargo_shielding_bay
Stats
CategoryProduction
Level2
Build Cost405,000 cr
Build Time175 ticks
Labor Cost16
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Lead Lining Workshop | 127,000 | 120 | 8 | 1 | 1 | 3 |
| L2 | Cargo Shielding Baythis tier | 405,000 | 175 | 16 | 2 | 1 | 5 |
| L3 | Lead-Lined Cargo Plant | 1,126,000 | 240 | 28 | 4 | 1 | 5 |
| L4 | Advanced Cargo Shielding Complex | 3,655,000 | 315 | 40 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.