Lead-Lined Cargo Plant
Heavy-duty production with reinforced frames handling continuous lead-sheet deposition and integrated coolant systems for thermal stability. Control nodes coordinate multi-stage sealing and pressure testing.
productionTier 3 of 4lead_lined_cargo_plant
Stats
CategoryProduction
Level3
Build Cost1,126,000 cr
Build Time240 ticks
Labor Cost28
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Lead Lining Workshop | 127,000 | 120 | 8 | 1 | 1 | 3 |
| L2 | Cargo Shielding Bay | 405,000 | 175 | 16 | 2 | 1 | 5 |
| L3 | Lead-Lined Cargo Plantthis tier | 1,126,000 | 240 | 28 | 4 | 1 | 5 |
| L4 | Advanced Cargo Shielding Complex | 3,655,000 | 315 | 40 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.