Cryogenic Condensing Line
A specialized cooling plant that chills incoming gas streams to −186°C, liquefying argon for separation. Relies on superconductor coils and precision sensor control to maintain the deep-freeze needed for selective condensation.
productionTier 1 of 4cryogenic_condensing_line
Stats
CategoryProduction
Level1
Build Cost149,000 cr
Build Time170 ticks
Labor Cost14
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Cryogenic Condensing Linethis tier | 149,000 | 170 | 14 | 1 | 1 | 3 |
| L2 | Automated Argon Separator | 552,000 | 250 | 28 | 2 | 1 | 6 |
| L3 | Cryogenic Separation Plant | 1,666,000 | 330 | 49 | 4 | 1 | 7 |
| L4 | Precision Cryogenic Works | 4,885,000 | 420 | 70 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.