Precision Cryogenic Works
State-of-the-art facility featuring redundant quantum control cores, full sensor array integration, and advanced precision optics for real-time intake optimization. Produces argon condensers at industrial scale with minimal cycle time.
productionTier 4 of 4precision_cryogenic_works
Stats
CategoryProduction
Level4
Build Cost4,885,000 cr
Build Time420 ticks
Labor Cost70
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Cryogenic Condensing Line | 149,000 | 170 | 14 | 1 | 1 | 3 |
| L2 | Automated Argon Separator | 552,000 | 250 | 28 | 2 | 1 | 6 |
| L3 | Cryogenic Separation Plant | 1,666,000 | 330 | 49 | 4 | 1 | 7 |
| L4 | Precision Cryogenic Worksthis tier | 4,885,000 | 420 | 70 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.