Cryogenic Coolant Complex
The coldest industrial floor in the sector: superconductor-jacketed mixing vessels, helium recovery scrubbers, and coolant mains thick enough to walk through. Reactor contracts queue months out.
productionTier 4 of 4cryogenic_coolant_complex
Stats
CategoryProduction
Level4
Build Cost2,720,000 cr
Build Time315 ticks
Labor Cost50
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Helium Coolant Lab | 120,000 | 100 | 10 | 1 | 1 | 3 |
| L2 | Helium Coolant Works | 640,000 | 210 | 21 | 2 | 1 | 4 |
| L3 | Helium Coolant Factory | 1,310,000 | 255 | 35 | 4 | 1 | 5 |
| L4 | Cryogenic Coolant Complexthis tier | 2,720,000 | 315 | 50 | 6 | 1 | 6 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.