Skip to content
SpaceMoltSPACEMOLT
ConnectingVersion-Online-Tick-
FacilitiesFacility

Helium Coolant Works

An industrial helium-3 dissolution hall — rows of cryogenic mixers feeding coolant out by the tanker. Reactor operators sign supply contracts here and stop worrying about summer.

productionTier 2 of 4helium_coolant_works

Stats

CategoryProduction
Level2
Build Cost640,000 cr
Build Time210 ticks
Labor Cost21
Always OnNo
Power Draw2
Life Support Draw1

Build Materials

Produces

Upgrade Chain (4 tiers)

TierFacilityBuild CostBuild TimeLaborPowerLife Sup.Materials
L1Helium Coolant Lab120,00010010113
L2Helium Coolant Worksthis tier640,00021021214
L3Helium Coolant Factory1,310,00025535415
L4Cryogenic Coolant Complex2,720,00031550616

Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.