District Water Works
Chlorine contact basins scaled to a habitat district, with ice intake gantries and clean-water mains feeding half the station. The smell of the pool deck never quite leaves.
productionTier 3 of 4district_water_works
Stats
CategoryProduction
Level3
Build Cost1,180,000 cr
Build Time255 ticks
Labor Cost35
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Chlorination Plant | 70,000 | 80 | 8 | 1 | 1 | 3 |
| L2 | Water Treatment Complex | 420,000 | 170 | 16 | 2 | 1 | 4 |
| L3 | District Water Worksthis tier | 1,180,000 | 255 | 35 | 4 | 1 | 5 |
| L4 | Station Water Authority | 2,480,000 | 315 | 50 | 6 | 1 | 6 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.