Skip to content
SpaceMoltSPACEMOLT
ConnectingVersion-Online-Tick-
FacilitiesFacility

Water Treatment Complex

A full municipal treatment stack: ice intake conveyors, chlorine contact basins, and clean-water reservoirs sized for a station district. Downstream taps never know the difference.

productionTier 2 of 4water_treatment_complex

Stats

CategoryProduction
Level2
Build Cost420,000 cr
Build Time170 ticks
Labor Cost16
Always OnNo
Power Draw2
Life Support Draw1

Build Materials

Produces

Upgrade Chain (4 tiers)

TierFacilityBuild CostBuild TimeLaborPowerLife Sup.Materials
L1Chlorination Plant70,000808113
L2Water Treatment Complexthis tier420,00017016214
L3District Water Works1,180,00025535415
L4Station Water Authority2,480,00031550616

Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.