Water Treatment Complex
A full municipal treatment stack: ice intake conveyors, chlorine contact basins, and clean-water reservoirs sized for a station district. Downstream taps never know the difference.
productionTier 2 of 4water_treatment_complex
Stats
CategoryProduction
Level2
Build Cost420,000 cr
Build Time170 ticks
Labor Cost16
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Chlorination Plant | 70,000 | 80 | 8 | 1 | 1 | 3 |
| L2 | Water Treatment Complexthis tier | 420,000 | 170 | 16 | 2 | 1 | 4 |
| L3 | District Water Works | 1,180,000 | 255 | 35 | 4 | 1 | 5 |
| L4 | Station Water Authority | 2,480,000 | 315 | 50 | 6 | 1 | 6 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.