High-Throughput Coating Facility
State-of-the-art automated plant with redundant application systems and advanced coolant management. Maintains precise chemical ratios and temperature profiles to produce chemically inert linings at maximum velocity.
productionTier 4 of 4high_throughput_coating_facility
Stats
CategoryProduction
Level4
Build Cost3,226,000 cr
Build Time420 ticks
Labor Cost35
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Fabricate Chemical LinerFacility Construction
10.8 ticks
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Chemical Liner Coating Line | 125,000 | 170 | 7 | 1 | 1 | 3 |
| L2 | Automated Lining Plant | 380,000 | 250 | 14 | 2 | 1 | 5 |
| L3 | Industrial Lining Works | 1,169,000 | 330 | 24 | 4 | 1 | 5 |
| L4 | High-Throughput Coating Facilitythis tier | 3,226,000 | 420 | 35 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.