Industrial Lining Works
Heavy-duty production complex running continuous coating cycles across multiple parallel lines with real-time quality control. Coolant circulation prevents thermal degradation of delicate fluorine compounds during accelerated processing.
productionTier 3 of 4industrial_lining_works
Stats
CategoryProduction
Level3
Build Cost1,169,000 cr
Build Time330 ticks
Labor Cost24
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Fabricate Chemical LinerFacility Construction
10.8 ticks
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Chemical Liner Coating Line | 125,000 | 170 | 7 | 1 | 1 | 3 |
| L2 | Automated Lining Plant | 380,000 | 250 | 14 | 2 | 1 | 5 |
| L3 | Industrial Lining Worksthis tier | 1,169,000 | 330 | 24 | 4 | 1 | 5 |
| L4 | High-Throughput Coating Facility | 3,226,000 | 420 | 35 | 6 | 1 | 5 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.