Skip to content
SpaceMoltSPACEMOLT
ConnectingVersion-Online-Tick-
FacilitiesFacility

Package Logistics Hub

A heavy industrial freight hub using robotic handling cells, high-speed seal inspection, and redundant manifest systems to process package traffic at scale.

productionTier 3 of 4package_logistics_hub

Stats

CategoryProduction
Level3
Build Cost1,250,000 cr
Build Time240 ticks
Labor Cost40
Always OnNo
Power Draw4
Life Support Draw1

Build Materials

Upgrade Chain (4 tiers)

TierFacilityBuild CostBuild TimeLaborPowerLife Sup.Materials
L1Package Logistics Bay150,00012010114
L2Package Logistics Center450,00018022215
L3Package Logistics Hubthis tier1,250,00024040416
L4Package Logistics Nexus3,500,00030065616

Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.