Skip to content
SpaceMoltSPACEMOLT
ConnectingVersion-Online-Tick-
FacilitiesFacility

Package Logistics Nexus

A fully automated freight nexus whose synchronized handling grids, quantum manifests, and continuous container flow provide exceptional package throughput.

productionTier 4 of 4package_logistics_nexus

Stats

CategoryProduction
Level4
Build Cost3,500,000 cr
Build Time300 ticks
Labor Cost65
Always OnNo
Power Draw6
Life Support Draw1

Build Materials

Upgrade Chain (4 tiers)

TierFacilityBuild CostBuild TimeLaborPowerLife Sup.Materials
L1Package Logistics Bay150,00012010114
L2Package Logistics Center450,00018022215
L3Package Logistics Hub1,250,00024040416
L4Package Logistics Nexusthis tier3,500,00030065616

Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.