Wiring Harness Plant
A larger facility with automated winding and multi-stage quality inspection for consistent bundle geometry. Processing cores and sensor arrays verify conductor continuity and insulation integrity.
productionTier 2 of 4wiring_harness_plant
Stats
CategoryProduction
Level2
Build Cost300,000 cr
Build Time180 ticks
Labor Cost18
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Wiring Harness Workshop | 104,000 | 120 | 9 | 1 | 1 | 3 |
| L2 | Wiring Harness Plantthis tier | 300,000 | 180 | 18 | 2 | 1 | 6 |
| L3 | Wiring Harness Facility | 817,000 | 240 | 32 | 4 | 1 | 7 |
| L4 | Wiring Harness Hub | 2,530,000 | 300 | 45 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.