Wiring Harness Workshop
A straightforward production line that spools, bundles, and terminates copper wiring with flex polymer insulation. Basic control systems manage cutting, stripping, and crimp operations.
productionTier 1 of 4wiring_harness_workshop
Stats
CategoryProduction
Level1
Build Cost104,000 cr
Build Time120 ticks
Labor Cost9
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Wiring Harness Workshopthis tier | 104,000 | 120 | 9 | 1 | 1 | 3 |
| L2 | Wiring Harness Plant | 300,000 | 180 | 18 | 2 | 1 | 6 |
| L3 | Wiring Harness Facility | 817,000 | 240 | 32 | 4 | 1 | 7 |
| L4 | Wiring Harness Hub | 2,530,000 | 300 | 45 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.