Advanced Sensor Assembly Line
Purpose-built production line for assembling higher-fidelity survey systems with dual sensor arrays and stabilized exotic material integration. Handles the added complexity of multi-component optical and control systems.
productionTier 1 of 4advanced_sensor_assembly_line
Stats
CategoryProduction
Level1
Build Cost1,443,000 cr
Build Time170 ticks
Labor Cost10
Always OnNo
Power Draw1
Life Support Draw1
Build Materials
Produces
Build Survey Scanner IIUtility
210 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Advanced Sensor Assembly Linethis tier | 1,443,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Geological Analysis Plant | 4,195,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Advanced Survey Scanner Factory | 12,347,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Precision Geological Instrument Works | 38,969,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.