Geological Analysis Plant
Larger facility with structural reinforcement and expanded processing capacity for handling the more demanding assembly of advanced scanner units. Multiple assembly stations reduce bottlenecks in crystal and sensor integration.
productionTier 2 of 4geological_analysis_plant
Stats
CategoryProduction
Level2
Build Cost4,195,000 cr
Build Time250 ticks
Labor Cost20
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Build Survey Scanner IIUtility
210 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Advanced Sensor Assembly Line | 1,443,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Geological Analysis Plantthis tier | 4,195,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Advanced Survey Scanner Factory | 12,347,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Precision Geological Instrument Works | 38,969,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.