Advanced Survey Scanner Factory
Heavy-duty automated production complex with quantum control cores and precision optics lines integrated into the main assembly flow. Exotic material handling systems and advanced cryogenic conditioning support rapid production cycles.
productionTier 3 of 4advanced_survey_scanner_factory
Stats
CategoryProduction
Level3
Build Cost12,347,000 cr
Build Time330 ticks
Labor Cost35
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Build Survey Scanner IIUtility
210 ticks · Facility only
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Advanced Sensor Assembly Line | 1,443,000 | 170 | 10 | 1 | 1 | 5 |
| L2 | Geological Analysis Plant | 4,195,000 | 250 | 20 | 2 | 1 | 6 |
| L3 | Advanced Survey Scanner Factorythis tier | 12,347,000 | 330 | 35 | 4 | 1 | 7 |
| L4 | Precision Geological Instrument Works | 38,969,000 | 420 | 50 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.